Image 6 of 9
Buy This Image:
Product measurements refer to paper size, not final print size. The following are an approximation of the actual print sizes for this image.
| Product Size | This Image |
|---|---|
| 8x12 Print | 8 in. x 12 in. |
| 10x15 Print | 10 in. x 15 in. |
| 16x24 Print | 16 in. x 24 in. |
| 24x36 Print | 24 in. x 36 in. |
| 30x45 Print | 29.9 in. x 45 in. |
For more information, see this page.
When the city considered preservation, they were forced to weigh $3 million in restoration costs against $300,000 for demolition. By the time the decision was made in May 2007, officials concluded that the building was simply beyond repair. Considering the extensive damage, I had to agree with them.
By the way, I don't know if this stick figure reminiscent of the The Blair Witch Project was deliberate or random, but it was damned nifty.
Photographed:
April 21, 2007
Image 6 of 9
Keywords: abandoned, decay, derelict, dilapidated, disrepair, flood, grafitti, ruins, tagging, urban exploration, vandalism, water damage